Three trades. One crew.
From debris control during an active build through the QA/QC sign-off that gets a unit ready for inspection — scheduled around your trades, priced by the square foot, and backed by a dedicated foreman on site.
Post-Construction Cleaning
Full turnover clean for newly built or renovated space, delivered unit by unit and floor by floor so each area is ready for inspection and move-in on the day the GC releases it.
- Kitchens: cabinetry, countertops, appliances, sinks
- Bathrooms: fixtures, tile, grout, mirrors
- Floors: carpet vacuum, hard-surface mop
- Corridors, stairwells, elevator lobbies
- Amenity spaces: clubhouse, fitness, leasing office
- Trash rooms, mail/package rooms, BOH areas
Final Cleaning
The last detail pass before the owner or management walkthrough — the difference between a unit that looks finished and one that passes inspection the first time.
- Spot-free glass, mirrors, and fixtures
- Baseboards, door frames, hardware, vents
- Full floor detail — vacuum and mop
- Punch-ready presentation for inspection
- Fast turnaround after trade re-entry
- Unit-by-unit QA/QC checklist available
Construction Site Cleanup
Rough clean and debris control during an active build, performed floor by floor or zone by zone as the GC releases areas — keeping trades moving without tripping over each other's mess.
- Debris removal and sweep by floor or zone
- Dust control ahead of finish trades
- Window frame and sill wipe-down of overspray
- HVAC diffuser, electrical box, and fixture wipe-down
- Coordination with the GC's dumpster and debris schedule
Execution approach, QA/QC,
and project readiness.
Every project moves through the same five stages, whether it's a 60-unit final clean or a full-building post-construction turnover.
Crews trained for construction turnover.
Let's scope your next project.
Send over the project name, unit count, and schedule — we'll follow up with a proposal and certificates of insurance.
Request a Bid